RMU Works Completion for 1 Unit of 2×4.5 MW Gandebal HEP

Introduction

In a remarkable feat, We proudly announce the successful execution of RMU works of 1 machine of the 2×4.5 MW Ganderbal Hydro Power Project, completed in 2021. Despite the unprecedented challenges posed by the COVID-19 pandemic, our team demonstrated unwavering dedication and expertise to deliver this critical infrastructure project.

Overcoming Adversity

The COVID-19 pandemic presented unforeseen obstacles, including:

– Rising Material Costs

– Supply Chain Disruptions

– Workforce Availability Challenges

However, RMU Works persevered, ensuring project completion.

A Nation-Building Initiative

This hydropower project contributes significantly to India’s renewable energy goals, bolstering the nation’s economy. With over 45 million units generated to date from this 4.5 MW machine, this project supports energy security, reduces carbon footprint, and fosters sustainable development.

ganderbal-hydro

Key Highlights

  1. Project Capacity: 2×4.5 MW
  2. RMU Carried for 1 Machine Only
  3. Scope of Work: Design Engineering Manufacturing, Supply Testing, and E&C of existing Powerhouse
  4. Total Generation: Over 45 million units (and counting)
  5. Completion Year: June-2021
  6. Salient Features:

a. Head: 137m

b. Speed: 500 rpm

c. Discharge: 1.38 cumecs

d. Turbine Type: Horizontal Francis

Quality Components

RMU Works ensured top-notch quality by designing and supplying the turbine in-house, procuring the following components of reputed make:

  1. Generator from Crompton
  2. Sourcing MIV through Fouress
  3. Utilizing Electrical Components from ABB
  4. Oil Pressure Unit: Hydac
  5. Other Components from Reputed Firms.

Conclusion

RMU Works’ success with the Ganderbal Hydro Power Project showcases our commitment to nation-building and sustainable energy solutions. We take pride in our team’s resilience and expertise.

Why RMU Works Are Needed in Hydro Power Plants

1. Replace worn-out Equipment

2. Upgrade Outdated Technology

3. Increase Efficiency (up to 10-15%)

4. Reduce Maintenance Costs (up to 20-30%)

5. Extend Plant Lifespan (up to 20-30 years)

6. Enhance Reliability, Safety, and Environmental Compliance

7. Meet Changing Grid Demands

Benefits

1. Increased Power Generation

2. Improved Efficiency

3. Reduced Costs

4. Extended Lifespan

5. Enhanced Reliability and Safety

Typical Upgrades

1. Turbines

2. Generators

3. Control Systems

4. Instrumentation

5. Transformers

6. Switchyard Components

When to Consider RMU

1. Plant age > 30+ years

2. Performance decline

3. Increased Maintenance Costs

4. Changing Grid Requirements

Contact Us

Mail id: commercial@gogoalhydro.com

LinkedIn: https://www.linkedin.com/company/31447473/admin/dashboard/

Website :www.gogoalhydro.com

#HydroPower #Renovation #Modernisation #Upgradation #Sustainability #Energy #GogoalHydro #RMU